HEre it is in the mostly assembled form. This was mainly a Test fit to make sure everything went together properly and get the demisions so we could build the support base for it.
What you dont see. Is most of the pluming system, The loading system, and the Cocking system.
I have the plumbing system to trigger the valves.
IM waiting on my 8 feet of 3/4" angle aluminum to build the loader.
And the metal for the blocks is coming with the other then i have to get the blocks flow jetted.
The piece between to 2 Flanges is going to be the Breach i just have to Dremel out the material.
The chamber is 11" of 3" pvc with the Fittings and the T at the end i figure Chamber volume is around 100" inches. The reason you see Two Valves in the picture is because Recharge is important. They are offset Phase and one charges the chamber when the other is not Firing. My design goal was for 4 Shots per second. The loading system should be able to do that, but the cannon should actually be able to fire >15 shots per second.
Both the Asco Valves are Trigger by a 1/8 QEV of which is piloted by a 4 Way Solenoid.
All of the actuators are piloted by QEVS, and piloted by 2x 4 way solenoids.
So total for the system
3x Regulators
8x 1/8th QEV
2x 1.5 Asco Pule Valves
3x 1/8th 4 Way Mac Solenoids 24v 5.4 watts
1x Custom Electronics Controller
4" Pipe
3" Pipe
2" pipe
2.5" pipe
3/4" pipe
3 Guages
Operating pressure should be a hair below, 65 PSI. For a nerf at 250 FPS.