
I still haven't decided on a barrel design and how to attach it. I'd like something modular so I can quickly swap different barrels. For now, that's just a leftover piece of 2" pipe for visualization.
The combustion chamber is 3", and I'll be installing a fan on the ball valve end.
I plan on installing that gauge into the metering pipe and using the valve on the propane bottle as a sort of throttle valve to reach the desired pressure. I'm planning on connecting the bottle to the metering pipe using PVC enforced tubing, and connecting the pipe to the combustion chamber using the same tubing. I have a 3/8" barb attached to a 3/8" nipple I plan on threading into the combustion chamber.
Based on my metering pipe size, I'll need about 25# of propane to achieve 4% in the combustion chamber. Will the tubing with hose clamps handle this with no leaks?
When I measured the volume of the combustion chamber (with water) I included everything up to the last 90 degree elbow. Is this correct? I assumed the combustion area was everything up until the projectile.
Any input is greatly appreciated, and no need to be kind. I'm expecting some rookie mistakes and I can handle criticism. Thanks.