Anyone want to send me one? I'm broke now.

But, I've teflon'd and screwed together all the metal fittings for the meter pipe, and filling/displacing of the gen2 tank. Everything is tapped and threaded into the PVC fittings to make the tank. I just need to calculate how long to make the tank.
Oh, and I still need to set up the ignition, but I have to wait for some place to call me back and set up an interview. (I need a job) I want to atleast fire this as a pneumatic real soon though.
Edit: What length of barrel would be best for a chamber that is 2" SCH80 and is 2 feet long?